33-35 Pavesi Street Smithfield 

Description: Internal Office Fitout & Construction of New Factory Buildings (connected to existing)

Our Involvement: SageBuild have been engaged by the Owner to manage the Design Finalisation and CDC Coordination for a Internal Office Fitout and Extensions of the Existing Factory Buildings.

Client: ABC Phase Switchboards (Echo Boards)

IMG_1924 2024-03-27 01_39_18
IMG_1938 2024-03-27 01_39_49
IMG_1934 2024-03-27 01_39_40
IMG_1932 2024-03-27 01_39_29
IMG_1936 2024-03-27 01_39_43
IMG_1937 2024-03-27 01_39_47
IMG_1947 2024-03-27 01_40_09
IMG_1946 2024-03-27 01_40_08

Completion: CDC Target Completion August 2024


U4 / 624 Botany Rd Alexandria

Description: Construction Fitout of a new Dental Surgery

Our Involvement: SageBuild have been engaged by the Owner (Dentist) to project manage the Design & Development process including coordination of the various planning and design documentation, in order to obtain a 'Complying Development Certificate' (CDC) for the new use of premises.

 

Client:  United Dental Pty Ltd (Artur Shirokov) 

W1
W2
W3

Completion: CDC received end of April 2024

Meriden School - Admin & Student Centre 

Description: Construction of a new Two Storey Administration and Student Centre building at the Prep School.

Our Involvement: SageBuild were engaged by Buildcorp Contracting in a Project Management capacity to manage their Early Contractor Involvement (ECI) role in the design process, to provide construction, design, and cost input to assist with the Design finalisation to suit the School’s budget, as well as assist the team with the Tender / ‘Works Offer.

 

Plan
Plan
Plan
Program

Client:  Buildcorp Contracting 

Completion:  Design finalisation & ‘Works Offer’ completed October 2021 

ON HOLD
134-136 Botany Rd, Alexandria

Our Involvement:  Working with Fuse Architects, SageBuild has been engaged by the Builder / Developer to manage the Design Finalisation and Construction Certificate Coordination.

Ground
Level 2
Montage

Description: Demolition of existing structures & construction of a mixed-use building comprised of 13 residential apartments, 1 retail/commercial tenancy, basement parking & associated landscaping.

Client:  Alan Ghosn Trust & Co

Completion:  Currently On Hold

90 - 94 Stoddart St, Roselands

Description: Demolition of existing structures to construct 16 Townhouses with basement car parking.

Our Involvement: Working with lead Architect, Bechara Chan

and Associates, SageBuild has been engaged by the Builder / Developer to manage the Design Finalisation and Construction Certificate Coordination.  

Client:  MRR Developments Pty Ltd

Stoddart St
Stoddart St
Stoddart St
Stoddart St
Stoddart St
Stoddart St
Site Plan

Completion:  CC Completed October 2021 

118-128 Tennyson Rd, Mortlake

Description: Six storey Residential Flat Building consisting of 36 residential units, two level basement, and Strata Subdivision.

Our Involvement: Working with project Architect, Blu Print Designs, SageBuild were engaged in a Development Management capacity, to manage the Design & Construction Certificate (CC) Coordination to assist the Property Developers to achieve CC ready to commence construction and with a fully coordinated set of plans. 

Client:  Blu Print Designs on behalf of Zalco Pty Ltd

Montage 1
Montage 2
Montage 3
B2 Plan
B1 Plan
GF Plan
L1 Plan
L4 Plan
L5 Plan

Completion: CC Completion currently On Hold 

10 Charles St, Charlestown

Description: Six storey Residential Flat Building consisting of 12 residential units, single level basement - 1 into 12 Lot Strata Subdivision.

Our Involvement: Working with project Architect, Blu Print Designs, SageBuild were engaged in a Development Management capacity, to manage the Design & Construction Certificate (CC) Coordination to assist the Property Developers to achieve CC ready to commence construction and with a fully coordinated set of plans. 

Montage 1
Montage 2
Montage 3
Montage 6
Plan 1
Plan 2
Plan 3
Plan 4

Client:  Blu Print Designs on behalf of Forrest Road Development Pty Ltd

Completion: CC Completed February 2020.

117-119 Foveaux St, Surry Hills

Description: Four storey infill apartment building with basement to the rear of the site, and alterations and additions to the existing terraces.

Our Involvement: Working with project Architect, Blu Print Designs, SageBuild were engaged in a Development Management capacity, to manage the Design & Construction Certificate (CC) Coordination to assist the Property Developers to achieve CC ready to commence construction and with a fully coordinated set of plans. 

3D Montage 1
3D Montage 2
Location Plan
Plan 1
Plan 2
Plan 3
Plan 6

Client:  Blu Print Designs on behalf of Yannec Pty Ltd

Completion:  Completed & ready for CC in May 2020

Tranxidis Group Boarding Homes

Description: Various existing boarding home buildings located in Sydney's Inner West

Our Involvement: Alongside Architect Blu Print Designs, SageBuild were engaged in a Development Management capacity to review the various Council Inspection Reports on behalf of the property owner, and coordinate and manage the various existing non- compliances to satisfy council and BCA requirements for the use of the boarding rooms. Most items were predominantly with respect to fire engineering and accessibility.

Client:  Blu Print Designs on behalf of Tranxidis Group

Completion:  Ongoing management to assist with council compliance requirements and closeout

6-8 Lords Ave, Asquith

Description: Five storey residential flat building comprising of 27 units and basement carpark.

Our Involvement: Working with project Architect, Blu Print Designs, SageBuild were engaged in a Development 

Management capacity, to manage the Design & Construction Certificate (CC) Coordination to assist the Property Developers to achieve CC ready to commence construction and with a fully coordinated set of plans. 

Client:  Blu Print Designs on behalf of Araluen Group Pty Ltd

3D 1
3
1
2
Plan 1
Plan 2
Plan 3
Plan 4

Completion:  Targeting Stage 1 CC by end of March 2020, and Stage 2 CC by mid May 2020

16-18 Meager Ave, Padstow

Description: Six Villa Homes with Strata Subdivision

Our Involvement: SageBuild were engaged in a Development Management capacity, to manage the 

Construction Certificate (CC) Coordination to assist the Property Developer satisfy all authority requirements, including NSW Rail Corridor conditions, to therefore achieve CC ready to commence construction and with a fully coordinated set of plans.

Client:  Patrick Li

Montage 1
Plan 5
Plan 1
Plan 2
Plan 3
Plan 4

Completion:  Complete & Ready for CC in June 2018

Pulley Drive, Ropes Crossing

Description: 3 storey Mixed-Use Development comprising 10 units, 4 ground floor commercial/retail tenancies and associated car parking.

Our Involvement: SageBuild were engaged in a Development 

Management capacity, to manage the Design & Construction Certificate (CC) Coordination to assist the Property Developer with design finalisation and to satisfy all authority requirements to achieve CC ready to commence construction and with a fully coordinated set of plans.

Montage 1
Plan 1
Plan 2
Plan 3
Plan 4
Elevation 1
Elevation 2

Client:  Trademark Building Services

Completion:  Complete & ready for CC in September 2019